MEPCO Consumer Services Guide

MEPCO New Connection: Complete Online Application Guide

Applying for a MEPCO new connection is the first step when a home, shop, office, or other property needs its own electricity supply. The process normally includes submitting an application through the currently designated MEPCO/ENC channel, providing identity and property documents, completing the site verification, receiving a Demand Notice, and paying the approved charges. This guide explains the documents to prepare, how to track your application, what connection categories mean, and what to do after you receive a Demand Notice.

Before you apply: Keep your CNIC, property or tenancy papers, a nearby electricity bill, and wiring details ready. Start from the official Electricity New Connection (ENC) portal and follow the current instructions shown for MEPCO. If the portal directs you to a different official channel, use that route instead.

Before You Apply: Make Sure You Need a New Connection

One of the easiest ways to avoid a rejected or delayed application is to choose the correct service before filling out the form. A new connection is generally for premises that need a new electricity supply point. If a meter is already installed, the right request may instead be a change of name, load extension or reduction, tariff change, or reconnection. MEPCO can confirm which application fits your circumstances.

Choose New Connection

When the premises needs a new meter

For example, a newly built house, a shop with no existing connection, or a premises that has never had its own supply point. MEPCO will assess whether a connection can be provided and what work is required.

Check First

When a meter or old connection already exists

If the property has an existing or previously disconnected meter, do not automatically submit a fresh application. Share the old reference number, if available, and ask MEPCO whether the case needs a name change, reconnection, load change, or resolution of outstanding dues.

Prepare these details before opening the form

  • The complete address where electricity is required, including street, locality, and nearby landmark.
  • The correct MEPCO subdivision for that address. A nearby bill can help identify it, but confirm the selection before submission.
  • The applicant’s name, CNIC, mobile number, and a working email address if requested.
  • The property ownership or occupancy papers and any owner consent required for a rented property.
  • A realistic estimate of the electrical load and the correct tariff purpose, such as residential or commercial.

Useful official reference: NEPRA’s Consumer Service Manual, revised November 26, 2025, covers new connections, supporting documents, connection categories, charges, and processing timeframes. Always check for any later official update before relying on a rule or timeline.

How to Apply for a MEPCO New Electricity Connection

The online application route is intended to reduce paperwork and let applicants follow their request more easily. However, the exact screens and submission instructions can change. Begin at the official ENC portal or use the official MEPCO channel currently specified for new connections. Do not rely on an old screenshot or a third-party form if it conflicts with the instructions displayed by MEPCO.

  1. 1
    Open the Official Application Channel

    Visit the ENC portal and look for the new connection application option. If the portal displays a notice directing MEPCO applicants to an official app, e-OPS channel, or customer facilitation office, follow the latest direction shown there.

  2. 2
    Select MEPCO and Your Local Subdivision

    Choose Multan Electric Power Company (MEPCO) as the distribution company, then select the subdivision responsible for the premises where the meter is required. The subdivision depends on the property’s exact address, not simply the nearest major city.

  3. 3
    Choose the Connection and Tariff Details

    Select the applicable connection category and tariff type, such as domestic, commercial, or another category offered in the official form. Enter the proposed load carefully; if you are unsure how to calculate it, ask MEPCO or a qualified electrical professional before submitting.

  4. 4
    Complete Applicant and Premises Information

    Enter your name and CNIC details exactly as shown on your identity document. Add the service address, contact information, ownership or tenancy information, and any reference details requested by the official application.

  5. 5
    Upload Clear Supporting Documents

    Upload the documents requested by the live portal in its accepted file formats and size limits. Make sure every page is readable, all corners are visible, and the applicant’s name and property details are consistent across documents.

  6. 6
    Review, Agree to the Terms, and Submit

    Before submitting, check the selected subdivision, tariff, requested load, address, and uploaded files. Save the application receipt, tracking number, or acknowledgement generated by the system.

  7. 7
    Complete Any Physical Verification or Document Submission

    MEPCO may verify the premises, inspect the site, or request original/physical copies as part of processing. Follow the specific instructions from the assigned office and keep a receipt for any documents handed in.

  8. 8
    Wait for the Demand Notice and Pay Through an Authorized Channel

    If the application is approved and charges are assessed, MEPCO will issue a Demand Notice. Check the applicant details, sanctioned load, payable amount, and payment deadline before paying through the bank or channel named in the notice.

  9. 9
    Submit Proof of Payment and Follow the Installation

    Keep the payment receipt and provide proof to MEPCO if the notice or office requires it. The connection is installed after the required verification, approvals, material availability, wiring checks, and other applicable steps are completed.

After submitting the online form: print and submit the application if required

Keep the tracking ID before leaving the confirmation page. If the current ENC interface provides a print option, use the official portal to retrieve the submitted form and follow any instructions to submit a signed printout or supporting papers to the concerned MEPCO office.

  1. Return to the official ENC portal and look for the option to print or retrieve an application.
  2. Select the relevant application type and MEPCO, if those fields are shown.
  3. Enter the tracking ID or other identifier requested by the portal.
  4. Review the retrieved form before printing; check that the name, address, tariff, and load are correct.
  5. Attach the documents requested by the official checklist and submit them to the office only if the current procedure requires physical submission.
  6. Ask for an acknowledgement or receipt when handing over any paperwork.

Important: A submitted online form does not mean the connection has been approved or installed. The ENC menu labels and physical-submission requirements can change, so follow the live portal and the instructions issued by MEPCO for your case.

Documents Required for a MEPCO New Connection

Prepare your documents before starting the application so you do not have to stop halfway through the form. The exact checklist may differ according to the tariff, ownership arrangement, connection category, and current MEPCO instructions. Use the list below as a preparation guide and confirm the final requirements on the official application.

Identity

Applicant’s CNIC

Keep a clear copy of the applicant’s valid Computerised National Identity Card. The name and CNIC number should match the information entered on the form. If the official checklist asks for attestation, follow that requirement.

Property

Proof of Ownership or Right to Occupy

This may include a registry, allotment document, ownership record, or another property document accepted by MEPCO. The office may request an affidavit or additional proof depending on the case.

Tenant Cases

Landlord’s NOC and Supporting Papers

If you are renting the premises, ask MEPCO which tenancy documents are required. A rent agreement and the owner’s no-objection certificate may be requested along with proof that the landlord owns the property.

Location

Nearby Consumer’s Electricity Bill

A recent bill for a nearby connection can help staff identify the correct location, subdivision, feeder, or pole. Use a bill from a genuinely nearby property and provide it only through the official application or office.

Electrical Work

Wiring Test Report

A wiring test report may be required and should be prepared by a qualified or licensed electrical contractor in line with applicable rules. Do not submit a report for wiring that has not been properly checked.

Witnesses

Witness CNIC Copies and Other Forms

The application may ask for witness identity documents, declarations, or an undertaking. Follow the live checklist instead of assuming that the same witness or attestation rules apply to every connection type.

Tips for Preparing Uploads

  • Use a scanner or take a clear photograph in good lighting; avoid glare, shadows, cropped edges, and blurred text.
  • Make sure the file format and maximum upload size meet the current portal requirements. Do not assume that every document must be exactly 300 KB; follow the limits displayed on the live form.
  • Use clear file names, such as Applicant-CNIC or Property-Document, if the portal permits file naming.
  • Keep the original documents available in case MEPCO asks to inspect or verify them.
  • Do not upload another person’s identity document or share CNIC copies with unofficial agents.

Previous connection at the same property? Tell MEPCO if a meter or connection existed there before. Unpaid dues, disconnection history, or property-record issues may need to be resolved before a new connection can be approved.

MEPCO New Connection Categories Explained

NEPRA’s Consumer Service Manual groups new connection applications by the requested load and supply voltage. The category affects the level of review and the process used to assess and approve the connection. The table below summarises the general categories described in the manual; MEPCO determines the applicable category from the application and technical assessment.

CategoryLoad RangeVoltageTypical Processing Time in NEPRA CSMWhat It Generally Means
Category 1Up to 15 kW230/400 V30 daysLower-load connections. The approving officer depends in part on tariff category.
Category 2Above 15 kW up to 70 kW230/400 V44 daysHigher-load connection requiring a more detailed service estimate and approval.
Category 3Above 70 kW up to 500 kW230/400 V58 daysLarge commercial, institutional, or industrial loads subject to technical review.
Category 4Above 500 kW up to 5,000 kW11 kV or 33 kV106 daysLarge installations that may require significant network and engineering work.
Category 5All loads in this category66 kV and above496 daysHigh-voltage connections with extensive technical review and network coordination.

These are regulatory load categories, not a guarantee that every property can receive a particular connection at the selected voltage. MEPCO may need to assess the local distribution network, transformer capacity, distance from existing infrastructure, sanctioned load, and applicable technical requirements.

Choose the load carefully. Do not select a higher or lower category simply to speed up the process. List the appliances or machinery you plan to operate and ask MEPCO or a qualified electrical professional to help establish the required sanctioned load.

MEPCO Demand Notice: Charges, Payment, and Next Steps

A Demand Notice is the official document that states the amount payable for the proposed connection after MEPCO has assessed the application. It is not the same as the application receipt or tracking number. The payable amount is case-specific and can depend on the approved load, connection type, service estimate, security deposit, network work, and other applicable charges.

Step 1

Check the Details

Verify the applicant’s name, address, category, sanctioned load, reference or application number, total amount, and payment deadline. Ask the issuing office to correct an error before paying.

Step 2

Pay as Instructed

Use only the bank or payment channel named in the valid Demand Notice or confirmed by MEPCO. Check the payee details and keep the original or digital payment receipt.

Step 3

Confirm Payment Receipt

Submit payment evidence if instructed and ask how the file will move to the next stage. Keep the tracking ID and payment receipt together for future follow-up.

How to retrieve a Demand Notice

When the application reaches the assessment stage, use the official channel identified by MEPCO to check whether a Demand Notice is available. If the ENC portal provides a print or download option, follow the fields shown on that page; it may ask for your tracking ID, CNIC, application type, or company selection.

  1. Open the official ENC portal or the current official MEPCO channel.
  2. Choose the Demand Notice or print/download option if it is available for your application.
  3. Enter the exact application identifier requested by the system.
  4. Before downloading or printing, confirm the applicant name, premises, load, amount, and due date.
  5. Pay only through the authorized channel shown on the valid notice and retain the payment receipt.
  6. If the portal asks you to upload proof of payment or a paid notice, complete that step and submit a copy to MEPCO if instructed.

If you cannot find the Demand Notice online, it does not automatically mean the application has been rejected. Check the status and contact the office responsible for the application.

Can the Demand Notice Be Paid Online?

Available payment options may vary by notice, bank, and the current MEPCO process. Do not assume that a Demand Notice can be paid through every mobile wallet or ordinary electricity-bill payment menu. Follow the instructions printed on the notice and confirm any uncertainty with the issuing MEPCO office.

Never pay an unofficial person to “release” a meter. A valid payment should have an official record. Do not send funds to a personal wallet or bank account shared through an unverified phone call or social media message.

How to Track Your MEPCO New Connection Application

Save the tracking ID or acknowledgement number shown after submission. Depending on the current MEPCO application channel, you may be able to use it in the ENC tracking facility or the official app or service indicated by MEPCO. Keep the exact number and check that you have selected MEPCO if the tracking screen asks you to choose a distribution company.

  1. Open the official tracking page or application channel named in your submission receipt.
  2. Select MEPCO if the system asks for the distribution company.
  3. Enter your tracking ID exactly as issued, without adding spaces or changing characters.
  4. Review the latest status and any request for missing documents, site inspection, or further action.
  5. If the record cannot be found, confirm that the application was submitted successfully and contact the subdivision or facilitation office shown in the acknowledgement.

Keep screenshots or copies of status updates and any official messages. If MEPCO asks for an additional document, provide it through the approved channel and retain proof of submission.

How Long Does a MEPCO New Connection Take?

The revised NEPRA Consumer Service Manual dated November 26, 2025 lists the following category-level timeframes in Annexure III. These are the published processing schedules for the steps shown in the manual, not a promise that every application will finish on the same date regardless of site conditions or missing information.

Connection CategoryLoad / VoltagePublished TotalBroad stages covered
Category 1Up to 15 kW at 400 V30 daysApplication registration, wiring test report and site survey; estimate and Demand Notice; work order/material; metering installation.
Category 2Above 15 kW to 70 kW at 400 V44 daysApplication review, survey and report verification; estimate and Demand Notice; work order/material; metering installation.
Category 3Above 70 kW to 500 kW at 400 V58 daysCircle-level processing, site survey, cost estimate, work execution and meter installation.
Category 4Above 500 kW to 5,000 kW at 11 kV or 33 kV106 daysCEO-office processing, survey, estimate, work order and higher-voltage installation steps.
Category 566 kV and above496 daysHigh-voltage processing, engineering approvals, material/work execution and metering.

These figures are taken from Annexure III of the NEPRA Consumer Service Manual (revised November 2025). Confirm the latest applicable rules with MEPCO, especially if a later amendment has been issued or the application requires additional network work.

Why delays happen: Missing paperwork, an incorrect subdivision, a disputed property record, pending wiring verification, network upgrades, transformer or meter availability, and incomplete payment records can affect progress. Ask the assigned office to explain the specific pending step instead of assuming every delay has the same cause.

If the application appears to have exceeded the applicable timeframe, keep the application receipt, Demand Notice, payment proof, and status history. Raise the matter through MEPCO’s official customer facilitation or complaint process and refer to the current NEPRA rules if you need to escalate it.

What Is the Cost of a MEPCO New Connection?

There is no single fixed price that applies to every MEPCO new connection. The amount on a Demand Notice is calculated for the particular application and can vary with the requested and approved load, tariff category, security deposit, service line requirements, distance and condition of the available network, and the work that must be completed.

Factors That Can Affect the Amount

  • Domestic, commercial, industrial, agricultural, or other tariff category.
  • Requested and approved sanctioned load.
  • Single-phase or three-phase supply requirements, where applicable.
  • Service line, pole, transformer, or other network work identified by MEPCO.
  • Applicable security deposit, service charges, and current approved rates.

How to Confirm the Exact Cost

  • Wait for the official Demand Notice or written estimate.
  • Check the line items and payment deadline.
  • Ask MEPCO to explain any charge you do not understand.
  • Do not rely on an old online price list as a current quotation.
  • Keep the notice and receipt for the full application process.

If an agent promises a meter for a fixed cash amount before MEPCO has assessed the application, be cautious. Only the official estimate and Demand Notice can establish the payable amount for your case.

Common MEPCO New Connection Problems and Solutions

Application Will Not Submit

Check required fields, file formats, file sizes, and internet connection. Make sure the selected subdivision and category are valid. Save your work before refreshing, if the portal allows it.

Tracking ID Is Not Working

Copy the ID from the original acknowledgement and check for confusing characters. Confirm that the application was actually submitted and use the tracking service currently specified by MEPCO.

Documents Have Been Rejected

Read the rejection reason carefully. A blurry CNIC, missing ownership page, mismatch in the applicant’s name, incomplete NOC, or wrong file type may require a corrected upload or physical document.

Demand Notice Has Not Arrived

Check the application status, email inbox and spam folder if email was provided, and any postal or office instructions. Contact the assigned subdivision with your tracking ID if the status does not explain the delay.

Payment Is Not Showing

Keep the bank receipt or transaction reference. Contact the payment provider and MEPCO through official channels to confirm whether the payment has been posted to your application.

Installation Is Delayed After Payment

Ask which step is pending: verification, wiring report, work order, material, meter installation, or another requirement. Request a written status update and retain all receipts.

Safety Checks and How to Avoid New Connection Scams

  • Use official websites and apps. Start with the ENC portal or the channel identified by MEPCO. Check the web address carefully before entering personal information.
  • Never share passwords or one-time codes. An application helper should not need your bank PIN, wallet PIN, or OTP.
  • Pay only against an official notice. Confirm the amount and authorized payment channel before transferring money.
  • Get receipts for documents and payments. Keep a copy of the application, Demand Notice, bank receipt, and any office acknowledgement.
  • Use qualified electrical workers. Do not energize new wiring or connect your premises to the distribution network yourself. Follow MEPCO’s inspection and safety requirements.
  • Do not assume approval means immediate installation. The connection must pass the applicable technical and administrative stages before supply begins.

Personal-data reminder: Your CNIC, property records, signatures, and contact details are sensitive. Upload them only through a verified official channel and avoid posting them in public comments or sending them to unverified social media accounts.

Frequently Asked Questions About MEPCO New Connection

How can I apply for a MEPCO new connection online?

Start at the official ENC portal at enc.com.pk and follow the current instructions for MEPCO. If the portal directs applicants to another official MEPCO channel, use the channel named there. Complete the application, provide the required documents, and save your acknowledgement or tracking ID.

What documents are usually required?

Common documents include the applicant’s CNIC, proof of ownership or occupancy, a landlord’s NOC for applicable tenant cases, a nearby consumer’s electricity bill, and a wiring test report where required. The live application checklist and MEPCO office determine the exact documents for your case.

Do I need a neighbour’s electricity bill?

A nearby electricity bill may be requested to help identify the location and relevant subdivision or network. Check the current MEPCO checklist and use a bill from a genuinely nearby connection.

Does every applicant need a wiring test report?

Electrical testing and a wiring test report may be required depending on the connection and applicable procedure. Ask MEPCO which report is required and have it prepared by a qualified or licensed contractor where applicable.

How do I track my MEPCO application?

Use the tracking facility or official application channel named in your acknowledgement. Enter the tracking ID exactly as issued and select MEPCO if requested. If the record is missing, contact the assigned subdivision with your receipt.

How many days are needed to install a new meter?

The timeframe depends on the category, load, project type, document verification, site conditions, and network or material requirements. NEPRA’s Consumer Service Manual specifies category-based timelines, so confirm the current applicable schedule with MEPCO instead of relying on a single estimate for every case.

What is a Demand Notice?

A Demand Notice is an official request for payment of the charges assessed for the proposed connection. It states the payable amount and relevant payment instructions. It is issued after the application has reached the applicable assessment stage.

How much does a MEPCO new connection cost?

The cost varies with the approved load, tariff and connection category, security deposit, service-line requirements, network work, and applicable charges. Your official Demand Notice is the source to use for the amount payable for your application.

Can a tenant apply for a new electricity connection?

A tenant may be able to apply when the required tenancy and owner-consent documents are provided. Requirements can vary, so confirm the current MEPCO checklist and obtain the landlord’s NOC if required.

Can I get a new connection if an old meter was installed at the property?

Tell MEPCO about any previous connection, meter, disconnection, or outstanding dues linked to the premises. The office will determine whether the case should be handled as a new connection or through another applicable procedure.

What should I do if my application is rejected?

Read the rejection reason and ask the assigned MEPCO office what needs to be corrected. Resolve missing documents, property-record issues, incorrect load details, or other stated problems before resubmitting or appealing through the official process.

Where can I get help with a delayed application?

Contact the MEPCO subdivision or customer facilitation office responsible for the premises. Keep your tracking ID, application copy, Demand Notice, and payment proof available. Use official MEPCO or NEPRA complaint channels if the issue remains unresolved.

Can I submit an application at a MEPCO office instead?

NEPRA’s Consumer Service Manual describes applications as being submitted in person or online. Contact the subdivision or customer facilitation office for the current paper-form process, the required documents, and how you will receive an acknowledgement or case number.

Is the 300 KB upload limit compulsory for every document?

Do not assume every file must be exactly 300 KB. Some older guides mention this limit, but the valid limit is the one displayed on the current application portal. Use the accepted format and size shown by the system.

What if MEPCO does not act within the published timeframe?

Keep the application acknowledgement, tracking ID, Demand Notice, payment receipt, and status updates. Ask the responsible office for a written explanation of the pending step. The revised Consumer Service Manual includes a provision requiring reasons for delay to be provided in writing in the circumstances described there; you can also use official complaint channels if the issue remains unresolved.

When should I receive my first electricity bill?

The revised NEPRA Consumer Service Manual says the first bill for a new connection should be issued within two months of the connection date. If it has not arrived, contact MEPCO with your meter and application details.

Editorial note: This independent guide is intended to explain the general MEPCO new-connection process. It is not an official MEPCO application or a substitute for the latest instructions from MEPCO, the Electricity New Connection portal, or NEPRA. Procedures, document requirements, payment channels, fees, and processing timelines can change. Confirm the current requirements through the official channel before submitting documents or making a payment.